Renovation and restoration works were carried out, such as the removal of arbitrary concrete structures (courtyard columns, arches, etc.) that altered the character of the monument, their replacement with stone structures similar to the old ones, restoring the old simple appearance and functionality, reconstruction and fixing of stone buildings, cells and chapels, construction of walls, installation of tractors and hidden sinks, construction of a drainage groove and rainwater drainage, grouting and waterproofing of walls to protect paintings and coatings, replacement of roofs with impregnated timber, insulation and cladding with slates, replacement of external and internal windows, restoration of the paved floors of the complex and the inner courtyard, reconstruction of the courtyard, construction of a paved path for access to the monastery, etc.